Unclaimed profile

Advanced Construction Robotics

Unclaimed · generated from public sources
advancedconstructionrobotics.com·Allison Park, Pennsylvania, US·founded 2016·11–50 employees·updated 2026-09-01·revision 1
Not reviewed by Advanced Construction RoboticsThis profile was generated from public sources. Every value carries the URL, retrieval date and exact quote it came from. Claim this profile →

Develops robotic equipment for autonomous rebar tying and placement on bridge-deck construction projects, designed to work alongside construction crews to increase productivity, reduce risk, and improve quality.

Offerings

2 listed

TyBOT

rebar tying robot
#tybot

Autonomous rebar-tying robot for bridge decks that self-navigates and self-ties without pre-programming, at over 1,200 ties per hour across working widths of 10 to 117 feet.

hardwareManufacturer
Pricing envelope
—Undisclosedmodel quotePrice filters return this as unknown, with a caveat. Sold via direct purchase, Robot-as-a-Service, or per-pound subcontract installation through the Certified Innovator program; price not published.
src
“Certified Innovator program as a subcontract for full installation of deck rebar”https://www.constructionrobots.com/tybotretrieved 2026-09-01 · extracted
channelsdirect
Terms noteOperational within 2 hours of arrival on site; crew training takes 3-5 days on-site.

IronBOT

rebar placement robot
#ironbot

Robot that lifts, carries, and self-places transverse and longitudinal rebar bundles on bridge decks, with a placement rate of over 5,000 pounds per hour, available via Robot-as-a-Service.

hardwareManufacturer
Pricing envelope
—Undisclosedmodel subscriptionPrice filters return this as unknown, with a caveat. Available exclusively through Robot-as-a-Service; purchase price not disclosed.
src
“Robot as a Service (RaaS)”https://www.constructionrobots.com/ironbotretrieved 2026-09-01 · extracted
channelsdirect
Terms noteOperational within 6-8 hours of arrival on site.

Proof

CustomersD.T. Read Steel Co., Inc.
Case studiesI-30 Crossing, Little Rock, AR →: 669,142 ties across 553 production hours with three units operating concurrently; 30% schedule savingsKoppel Bridge, Sewickley, PA →: 111,645 ties in 99 production hours; 50% productivity increase, 34% reduction in crew manhours, 32% shorter project durationPort St. Lucie Bridge, FL →: 33,404 ties in 35 production hours; 59% productivity increase, 37% reduction in crew manhours, 50% shorter duration
MembershipsConstructors Association of Western Pennsylvania · Ironworker Employers Association of Western Pennsylvania · Pittsburgh Robotics Network · Pittsburgh Technology Council · Associated General Contractors of America

Who it is for

Industriesconstruction, infrastructure, bridge construction
Use casesbridge deck rebar tying, bridge deck rebar placement
RegionsUS

Who the company says it sells to. These regions are not an availability filter; the service area is.

Facts on this page were generated from public sources and have not been reviewed by Advanced Construction Robotics.

Report a correction →